Work-in-Progress 43

I’ve been knitting away furiously trying to get some things finished over the last little while, and I’m excited to have a couple of FO’s to show you on Friday.  I’ve also been planning some Christmas knitting, and ordering yarn.  I have also been working away on two projects…

Firstly the Wendy Tank Top, which I must confess was becoming a bit of a drag – the seemingly endless K2,P2 rib on 2 1/4 mm needles most particularly. So I devoted a couple of hours and went at it, and finally completed the rib.  The body section is knitting up much faster 🙂 .  I’m a mere nine rows away from shaping the armhole and, as it’s a vest top, and it’s the front, it will go pretty quickly from there!

Wendy Tank Top (front)

Secondly, I’ve cast on my final Autumn project – Debbie Bliss’s Cabled Moss Stitch Hat – it’s my first ever cabled garment – wish me luck!

Autumn Project #3 Cabled Moss Stitch Beret

To see more of today’s Works-in-Progress, check out Tami’s blog over at Tami’s Amis

This entry was posted in Knitting and tagged , by Carolyn. Bookmark the permalink.

About Carolyn

This blog has served different purposes over the years - it started out following a Three Beautiful Things (3BT) structure: and I used to record three things, often the ordinary moments in life, which made me smile that smile. Then, I joined a community of knitters sharing my progress on what I was knitting that week. Now, after a long hiatus, I'm back to share an unusual new knitting project...

2 thoughts on “Work-in-Progress 43

  1. Yay at finishing the rib!!Hope you manage to get it finished soon. I bet the hat will look fab. I love cables, you’ll be doing them with no problem at all 🙂

  2. Pingback: Finished Object Friday! | ordinary moments

Comments are closed.