Work-in-Progress Wednesday 69

I’m very happy to be able to tell you that I have finally completed the body section of Wasabi 🙂 .

Wasbi - body completeWasabi – body completed

Wasabi - buttonholesWasabi – buttonholes

Wasabi - armholeWasabi – armholes

So now I need to decide how long to make the sleeves. But before I can get started on that I need to go shopping – once again, the pattern isn’t clear, but from the instructions I assume the sleeves are knitted in the round. This being the case, I need to buy shorter circular needles before I can get started…

That’s it from me today, but do check out what other people have been up to over at WIP Wednesday with Tami’s Amis, and visit Ginny’s Yarn Along.

tami_wipwyarnalong_gsheller_lilac

 

4 thoughts on “Work-in-Progress Wednesday 69

  1. Looking good! I’m sure M will be delighted 🙂
    If you’re itching to crack on with the sleeves you could always try doing a magic loop method with your circulars… I sometimes prefer it to using dpns since because I can’t always get an even tension across needle changes.

  2. Thanks! I tried magic loop a while back, and it was a major fail – I couldn’t get my tension right, and in the end I reverted to dpns – presumably I was doing something wrong! I think I’ll be able to get up to McA tomorrow though 🙂 , so hopefully that will be problem solved!

Comments are closed.